XINCHOR

Wind Turbine Tower Strengthening

As wind turbines grow taller and blades longer, concrete tower sections face increasing loads. Our CFRP strengthening systems upgrade tower capacity without reconstruction.

30–50%
Load Capacity Increase
20+ years
Service Life Extension
1/5
Weight vs Steel
5–7 days
Typical Retrofit Time

Desafíos

Increasing turbine capacity requires stronger towers
Fatigue cracking in concrete tower sections
Tower height extension to capture higher wind speeds
Harsh environmental exposure (UV, salt, freeze-thaw)
Minimal downtime required during retrofitting

Beneficios

Increase tower load capacity by 30–50%
Extend service life by 20+ years
No heavy lifting equipment — lightweight CFRP installation
Minimal turbine downtime during retrofit
Corrosion-proof — outlasts steel reinforcement

¿Necesita una Solución?

Nuestro equipo diseña esquemas de refuerzo personalizados.